Agilent Technologies LSCA - Our measure is your success
clear
white
clear
white
clear

5975C GC/MSD Installation & Maintenance Videos 

white
clear clear clear clear clear

grey1
Downloads and Utilities
Education & Events
Frequently Asked Questions
DNA MicroArrays
Gas Chromatography
Lab-on-a-Chip
Life Sciences Informatics
Liquid Chromatography
Mass Spectrometry
Networked Data Systems
Proteomics
Installation and Maintenance Videos
Literature Library
Parts Information
Description, Pricing, and Availability
Illustrated Parts Breakdowns
Support Services - Finding
Warranty Status - Verifying

grey1

These videos can help you perform common maintenance procedures for the Agilent 5975C GC/MSD. As always, Agilent's Technical Support Team is available to answer any questions you may have regarding installation or maintenance of Agilent products.

Before you start any of the tasks below, please review the important safety precautions on pages 17 and 18 in the 5975 MSD Operation Manual found on the Instrument Utilities CD that was delivered with your system.

Installing the GC Column

  1. In the MSD ChemStation or from the GC keyboard, initiate a vent and wait for the process to complete
  2. Turn off the MSD
  3. Remove the front window cover
  4. Open the vent valve
  5. Open (flip down) the analyzer cover
  6. Open the analyzer
  7. Install the column into the transfer line
  8. Close the analyzer
  9. Turn on the MSD
  10. Pump down the MSD
  11. Close (flip up) the analyzer cover
  12. Install the front window cover

Replacing the Filaments

  1. In the MSD ChemStation or from the GC keyboard, initiate a vent and wait for the process to complete
  2. Turn off the MSD
  3. Remove the front window cover
  4. Open the vent valve
  5. Open (flip down) the analyzer cover
  6. Remove the analyzer
  7. Remove the source from the analyzer
  8. Remove and replace the filaments
  9. Install the source in the analyzer
  10. Install the analyzer
  11. Turn on the MSD
  12. Pump down the MSD
  13. Close (flip up) the analyzer cover
  14. Install the front window cover 

Cleaning the EI Ion Source

  1. In the MSD ChemStation or from the GC keyboard, initiate a vent and wait for the process to complete
  2. Turn off the MSD
  3. Remove the front window cover
  4. Open the vent valve
  5. Open (flip down) the analyzer cover
  6. Remove the analyzer
  7. Remove the source from the analyzer
  8. Remove the filaments
  9. Identify ion source parts
  10. Source parts that need to be cleaned (also available as a downloadable and printable document, 541 kb)
  11. Disassemble the EI source
  12. Clean the EI source
  13. Sonicate the source parts
  14. Reassemble the EI source
  15. Install the filaments
  16. Install the source in the analyzer
  17. Install the analyzer
  18. Turn on the MSD
  19. Pump down the MSD
  20. Close (flip up) the analyzer cover
  21. Install the front window cover 

Cleaning the CI Ion Source

  1. In the MSD ChemStation or from the GC keyboard, initiate a vent and wait for the process to complete
  2. Turn off the MSD
  3. Remove the front window cover
  4. Open the vent valve
  5. Open (flip down) the analyzer cover
  6. Remove the analyzer
  7. Remove the source from the analyzer
  8. Remove the filaments
  9. Source parts that need to be cleaned (pdf, 541 kb)
  10. Disassemble the CI source
  11. Clean the CI source
  12. Sonicate the source parts
  13. Reassemble the CI source
  14. Install the filaments
  15. Install the source in the analyzer
  16. Install the analyzer
  17. Turn on the MSD
  18. Pump down the MSD
  19. Close (flip up) the analyzer cover
  20. Install the front window cover 

Replacing the Detector Electron Multiplier Horn

  1. In the MSD ChemStation or from the GC keyboard, initiate a vent and wait for the process to complete
  2. Turn off the MSD
  3. Remove the front window cover
  4. Open the vent valve
  5. Open (flip down) the analyzer cover
  6. Remove the analyzer
    Note: If you have a triple-axis detector, skip to step 6.
  7. Remove and replace the horn from the analyzer
    Note: The following steps should be done if you have a triple-axis detector.  Otherwise, skip to step 8.
  8. Remove the triple-axis detector horn
  9. Install the triple-axis detector horn
  10. Install the analyzer
  11. Turn on the MSD
  12. Pump down the MSD
  13. Close (flip up) the analyzer cover
  14. Install the front window cover 

Filling the Calibration Vial

  1. Remove the front window cover
  2. Remove, refill, and install the calibration vial
  3. Install the front window cover 

Changing the Mechanical (Roughing) Pump Oil

  1. In the MSD ChemStation or from the GC keyboard, initiate a vent and wait for the process to complete
  2. Turn off the MSD
  3. Remove the front window cover
  4. Open the vent valve
  5. Drain the oil from the pump
  6. Add oil to the pump
  7. Turn on the MSD
  8. Pump down the MSD
  9. Install the front window cover 

Changing the Diffusion Pump Oil

  1. In the MSD ChemStation or from the GC keyboard, initiate a vent and wait for the process to complete
  2. Turn off the MSD
  3. Remove the front window cover
  4. Open the vent valve
  5. Remove the GC column from the transfer line
  6. Move the MSD away from the GC
  7. Remove the diffusion pump
  8. Drain the oil from the pump and refill
  9. Install the diffusion pump
  10. Move the MSD back up against the GC
  11. Install the column into the transfer line
  12. Turn on the MSD
  13. Pump down the MSD
  14. Install the front window cover
grey1
related_bottom_left clear clear clear
clear clear
grey2