These videos can help you perform common installation, maintenance, and troubleshooting procedures for Agilent products. As always, Agilent's Technical Support Team is available to answer any questions you may have.
Clicking on the video title will launch the video automatically. The 6890 and 6850 videos can be saved to your computer by right-clicking the Download link and selecting "Save Target As …" browser function. Once downloaded, double-click on the .wmv file to view the video.
|
7890A General Troubleshooting
Baseline disturbances Fronting peaks Ghost peaks Tailing peaks Split peaks Retention time shifts Changes in peak size Loss of resolution over time
7890A Inlet
Split/Splitless
Installing the GC column Creating a maintenance method Replacing the septum, liner, and o-ring Replacing the gold seal Changing the split vent trap Checking for leaks
Multimode Inlet (MMI)
Maintaining the MMI

6890 Inlet
Split/Splitless
Liner Replacement (Download, 2.0MB) Column Installation (Download, 1.9MB) Gold Seal Replacement (Download, 1.7MB) Syringe Installation (Download, 1.3MB) PTV
Column Installation (Download, 1.2MB) Liner Installation (Download, 3.0MB) Silver Seal Replacement (Download, 1.6MB)
PCOC
Column Installation (Download, 1.0MB) Septum Replacement (Download, 0.9MB)
6890 Detector
Flame Ionization
Column Installation (Download, 0.7MB) Jet Replacement (Download, 1.4MB) Collector Maintenance (Download, 1.3MB) Ignitor Replacement (Download, 0.7MB)
6850 Inlet
Capillary Inlet Leak Test (Download, 3.7MB) Capillary Inlet Maintenance (Download, 5.1MB) Capillary Inlet Vent Test (Download, 2.7MB) Syringe Installation (Download, 1.3MB)
6850 Detector
FID Maintenance (Download, 4.1MB)
6850 System Maintenance
Split Vent Trap Replacement (Download, 2.1MB) |
|